Next: Calibrating the Monte Carlo
Up: The modules in the
Previous: TRT prototype
The material included in the simulation matches the amount and
distribution in the beamline to an accuracy better than the 10%
uncertainty in the actual amount of material present. The material in
the simulation for the 1996 testbeam run including the prototype and
all detectors in front of it is summarised in
table 5.3.
Table 5.3:
The amount of material in the simulation of the testbeam
in 1996 measured in radiation lengths ( X0) and
absorption lengths (
).
| Testbeam part |
X0 (%) |
(%) |
| 5 TRT sectors |
8.67 |
3.73 |
| 3 Silicon detectors |
2.03 |
0.43 |
| 2 Beam chambers |
2.00 |
0.48 |
| 3 scintillators |
4.87 |
2.30 |
| Air |
2.10 |
0.86 |
| Total |
19.70 |
7.80 |
Next: Calibrating the Monte Carlo
Up: The modules in the
Previous: TRT prototype
Ulrik Egede
1/8/1998