Production test of 20 FECs are in http://www.hep.lu.se/eudet/pictures/fectest/ directory FEC tested ---------------------- 20090117 fec 1,6-10 (fec 1 is a short retest of previously tested fec 1). 20090118 fec 11-15 20090119 fec 16-25 files are called fec--combined.pdf is written on the FEC kapton cables connected on inputs no shielding/grounding this file is in the directory 20090117 Summary: fec 23: channel 67 - low rms high pedestal (i.e. same behaviour as fec 2 channel 120) fec 25: channel 110 20-30% higher in pedestal value